Solar Electrical services for the solar generation industry.
Saber provides full substation and BOP engineering along with all infrastructure to connect solar farms to the grid.
Saber enables utility-scale solar developers to efficiently and reliably interconnect generation assets to the electric grid by delivering the full suite of high-voltage engineering, construction, and commissioning services required for substations and transmission line infrastructure. While we do not build solar facilities themselves, we provide full design and engineering and we serve as a trusted interconnection partner, managing system studies, procurement, construction, testing, and commissioning in strict accordance with utility and regulatory requirements. Our integrated EPC capabilities, experienced field execution, and proven track record across complex interconnection projects help developers mitigate risk, control schedules, and achieve timely commercial operation—while providing the repeatable, scalable delivery model trusted by our clients.Representative facility types:

345 – 34.5 kV solar interconnection substation in south Texas
- Distribution-connected solar farms
- Utility-scale solar farms
- Microgrids
- Co-located BESS wind and/or solar
Representative projects and services:
- Interconnect studies
- High-voltage substations
- High-voltage transmission lines
- Overhead and underground distribution
- Substation and BOP equipment maintenance and commissioning
- Relay upgrades
- Protection and control systems
- SCADA upgrades and installation
- EMS configuration
- DC system installation, te
sting and maintenance - Electrical system studies
- Capacitor and filter bank additions
- NETA acceptance/commissioning testing on new sites
- Annual NETA maintenance testing
- Infrared surveys
- Monthly inspections
- Evergreen maintenance contracts